Next Flows

Documenting in progress
We're taking extra care to make the editing docs as easy to use as possible, showing exactly what to click and what happens next. Some pages are still being written, so check back soon.

For what Next and Previous Flows mean when you're reading a Flow, jump to Next Flows and Previous Flows.
Adding a Next Flow
Select an End, Step or Data element and choose Link Next Flow in its menu. Pick an existing Flow, or create a new one to link. An element can have several Next Flows, for example when a process branches to different teams, but each Flow only once, and a Flow linked to an element as its Child Flow can't also be its Next Flow.
Linking a Next Flow records the relationship on both Flows: the Next Flow shows this Flow as its Previous Flow.

If the other Flow is the detail of one element rather than what comes after it, link it as a Child Flow instead.
Removing a Next Flow
Use the unlink control on the Next Flow's card. Deleting the element removes its Next Flows too, and undo brings them back.
Removing a Previous Flow
Previous Flow cards are read-only, because the link belongs to the Previous Flow. To remove it, open the Previous Flow and unlink the Next Flow card there.
Deleting linked Flows
Because a Next Flow is part of the process map's structure, it can't be deleted while it's linked: its delete button shows Unlink from other Flows before deleting. Remove the link from the Previous Flow first, then delete it.
